Case Study

City of Perris striping & Signing

Intro

Full Signing & Striping Plan, Radar Speed Feedback, and Push-Button Activated Crosswalks.

RK Engineering Group conducted a review of C Street from San Jacinto Avenue to 4th Street, and 3rd Street from B Street to C Street to address challenges noted by users of the roadways, including bus drivers of the adjacent Metrolink and Riverside Transit Agency station. Existing traffic counts and speeds were collected and analyzed to develop recommendations to improve conditions for all users of the roadway. With the implementation of a full signing and striping plan, additional features such as radar speed feedback signs and a push-button activated lighted crosswalk were installed throughout the study area.

Details

Full signing and striping plan, additional features such as radar speed feedback signs and a push-button activated lighted crosswalk were installed throughout the study area.

Get In Touch

1401 DOVE STREET, SUITE 540
Newport Beach, CA 92660
TEL: 949.474.0809
Email Us Here