City of Perris traffic Review

Intro

C Street – 4th Street to San Jacinto Avenue Traffic Review, City of Perris

Through this analysis, RK Engineering Group developed recommendations to further improve current and future operations along the roadway segment and at the intersections of C Street at 1st Street, and C Street at 3rd Street. The existing Metrolink station and bus depot runs along the east side of C Street and it had been reported that it was difficult for buses to enter and exit the existing Metrolink station; therefore, RK studied and addressed that concern along with other issues.

Details

The analysis will help determine if the existing intersections meet the warrants for an all-way stop based on existing conditions. 